New Lab:

         
  Links

 

 

Oct 2009 (before)

Dec 2009 (breaking walls)

Mar 2010 (new floor)

May 2010 (beamline construction)

ultrafast laser - ion beam lab (2011)


  1.2 ton optical table

 

Oct 2010 (Laser arrived)

 

Dec 2010 (spectrometer construction)

    

Itamar & Yishai assembling (2011)

New lab for ERC project (2013)